Tuesday, March 29, 2016

Jobs Interview Questions and Answers Resume Points Cutover Checklist


SAP Job Resume Points


He has more than 13 years of SAP R/3 experience in managing projects, data migration and ABAP development. He has managed small to medium size projects for roll-outs to 10 countries. As architect and technical consultant has worked on wide range on SAP modules (MM, SD, PM, PP, PS, HR and FI). He has been involved in analysis of functional requirements, drafting technical specifications, development and unit testing and delivers timely and quality solutions. He has an experience of working in capacity of onsite/offshore coordinator, team lead and team member. He has got strong logical and analytical capabilities. Some of his strengths are positive attitude, good grasping power and urge to learn new things.


SAP BI Cutover Task CHECKLIST

Description
Schedule downtime of ECC for initial loads
Determine test queries
Schedule resources for cutover including basis
Setup cutover role for BW and source systems
Assign user authorisations in portal if applicable
Set up ALEREMOTE (BWREMOTE) with proper security
Test cutover roles
Set up BW ensure connections to source systems
Validate source system settings
Check FTP directory for flat files
Manually configure in BW (RS_PERS_ATIVATE) per note 754206
Apply SAP notes to Prod
Apply database/kernel patches to prod
Set up printers
Check permitted chars
Check default package size (spro)
Check flat file paramters (spro)
Check any external systems need rescheduled/impacts of this change
Backup BW system
Ensure Checkpoint calls (eg ECC system/BW system offline completed) are in there

Transport requirements:/Order:
Change source system name after transport (rsa1)
Maintain source system ids (rsa1)
Transport ECC data-sources
Transport data-sources in VW
Replicate datasources
Transport info objects, validate
Info Providers, valudate
Transformations, validate
DTP, valudate#Info packages, validate
Process chains, validtate
Queries & query elements
Reporting roles
Web Templates

Portal:
Set up portal, save i-views

Prior to load:
Check traffic light settings
Set traffic light waiting time
Check permitted chars (RSKC)
Lock users out of ecc
Transfer global settings

Validation:
Reporting roles
Web templates
Process chains
Data loads
Queries and analysis

Data loads:
Set up programs in ecc
Schedule jobs for v3 logistics cockpit
Run delta initialisations for master data
Run delta initialisations for transaction data
Schedule periodic loads
Schedule process chains
Monitor loads


Labels: , , , , , , ,